Specialized Studies Related to Overtime and Shift Work
Adrian, James J., Construction Productivity Improvement, Elsevier Science Publishing, New York, 1987.
American Association of Cost Engineers, Effect of Scheduled Overtime on Construction Projects, Morgantown, W.V., October, 1973.
American Subcontractors Association, Associated General Contractors of America and Associated Specialty Contractors, Inc., Owner’s Guide on Overtime, Construction Costs and Productivity, Washington, D.C., July, 1979.
Brunies, Regula and Zey Emir, Calculating Loss of Productivity Due to Overtime Using Published Charts – Fact or Fiction, The Revay Report, Vol. 20, No. 3, November, 2001
Bureau of Labor Statistics Bulletin No. 917, Hours of Work and Output, U.S. Department of Labor, Washington, D.C., 1947.
Business Roundtable, Effect of Scheduled Overtime on Construction Projects – Coming to Grips with Some Major Problems in the Construction Industry, New York, 1974.
Construction Industry Cost-Effectiveness Task Force, Scheduled Overtime Effect on Construction Projects, The Business Roundtable, New York, 1980.
Construction Industry Institute, The Effects of Schedule Overtime and Shift Schedule on Construction Craft Productivity, Source Document 43, Austin, Texas, December 1988.
Construction Industry Institute, The Effects of Schedule Overtime on Labor Productivity: A Literature Review and Analysis, SD-43, Austin, Texas, 1993.
Construction Industry Institute, The Effects of Schedule Overtime on Labor Productivity: A Quantitative Analysis, SD-98, Austin, Texas, August 1994.
Hanieko, J.B. and W.C. Henry, Impacts to Construction Productivity, Proceedings of the American Power Conference, Vol. 53-11, 1991.
Haverton, John, Do You Know the Hidden Costs of Overtime?, Qualified Contractor, 1969.
McGlaun, R.C., Overtime in Construction, AACE Bulletin, Vol. 15, No. 5, 1973.
Mechanical Contractors Association of America, How Much Does Overtime Really Cost?, Bulletin 18A, Rockville, Md., 1968.
Mechanical Contractors Association of America, Change Orders, Overtime and Productivity, Publication M3, Rockville, Md., 1968.
National Electrical Contractors Association, Overtime and Productivity in Electrical Construction, Bethesda, Md., 1969.
National Electrical Contractors Association, Overtime and Productivity in Electrical Construction, 2nd Edition, Washington, D.C., 1989.
National Electrical Contractors Association, Overtime Work Efficiency Survey, Washington, D.C., 1962.
O’Connor, L.V., Overcoming the Problems of Scheduling on Large Central Station Boilers, American Power Conference, 31:518-28, 1969.
Overtime – The Other Side of the Coin – and – a – Half, Telephone Engineer and Management, 104 – 108, May 1, 1980.
Overtime vs. Productivity, 35 Electrical Contractor No. 1, 1970.
Singh, Amarjit, Claim Evaluation for Combined Effect of Multiple Claim Factors, Cost Engineering, Vol. 43, No. 12, pp 19 – 31, December 2001.
Thomas, H. Randolph, Jr., The Effects of Scheduled Overtime on Labor Productivity, Journal of Construction Engineering and Management, Vol. 118, No. 1, March, 1992.
Thomas, H. Randolph, Jr. and Karl A. Raynar, Effects of Schedule Overtime on Labor Productivity: A Quantitative Analysis, Construction Industry Institute Source Document 98, August, 1994.
U.S. Army Corps of Engineers, Modification Impact Evaluation Guide, Department of the Army, Office of the Chief of Engineers, Washington, D.C., July, 1979.